Energoinstal S.A.
Key figures
TTM to Jun 2026 · at the last reported close
- CEO
- Michal Wiecek
- Industry
- Specialty Industrial Machinery
- Employees
- 114
- Based in
- Poland
- Website
- www7.energoinstal.pl
Timeframe
View
Jump to
Balance Sheet
Total Assets fell 24% year over year to zł87.7M in Q1 2026, the eighth quarter in a row of year-over-year decline.
| Period | Total Assets | Total Liabilities Net Minority Interest |
|---|---|---|
| Q1 2026 | zł87.7M | zł44.5M |
| Q4 2025 | zł87.7M | zł43.9M |
| Q3 2025 | zł34.6M | zł3.97M |
| Q2 2025 | zł84.2M | zł38.9M |
| Q1 2025 | zł116M | zł76.7M |
| Q4 2024 | zł115M | zł73.1M |
| Q3 2024 | zł115M | zł73.3M |
| Q2 2024 | zł129M | zł84.1M |
| Q1 2024 | zł142M | zł95.4M |
| Q4 2023 | zł143M | zł95.5M |
| Q3 2023 | zł137M | zł91.7M |
| Q2 2023 | zł135M | zł90.2M |
Income
Total Revenue rose 29% year over year to zł10.5M in Q1 2026.
| Period | Total Revenue | Gross Profit | Net Income |
|---|---|---|---|
| Q1 2026 | zł10.5M | zł0.78M | -zł0.62M |
| Q4 2025 | zł36.6M | -zł1.22M | zł0.37M |
| Q3 2025 | zł2.64M | zł1.11M | zł0.02M |
| Q2 2025 | -zł1.87M | zł3.92M | zł2.67M |
| Q1 2025 | zł8.16M | -zł0.86M | -zł2.45M |
| Q4 2024 | zł13.3M | zł0.57M | -zł2.02M |
| Q3 2024 | zł15.4M | zł0.35M | -zł2.67M |
| Q2 2024 | zł14.0M | zł0.73M | -zł1.73M |
| Q1 2024 | zł19.6M | zł2.31M | -zł0.84M |
| Q4 2023 | zł24.7M | zł1.57M | -zł5.09M |
| Q3 2023 | zł27.5M | zł4.09M | zł1.20M |
| Q2 2023 | zł32.9M | zł6.94M | zł0.76M |
Operating Expenses
Operating Expenses fell 18% year over year to zł1.91M in Q1 2026. Selling General And Administration dragged, down 18% to zł1.91M, 100% of the total.
| Period | Selling General And Administration | Research & Development | Total |
|---|---|---|---|
| Q1 2026 | zł1.91M | – | zł1.91M |
| Q4 2025 | zł4.04M | – | zł4.04M |
| Q3 2025 | zł1.05M | – | zł1.05M |
| Q2 2025 | -zł0.08M | – | -zł0.08M |
| Q1 2025 | zł2.32M | – | zł2.32M |
| Q4 2024 | zł2.37M | – | zł2.37M |
| Q3 2024 | zł2.40M | – | zł2.40M |
| Q2 2024 | zł2.63M | – | zł2.63M |
| Q1 2024 | zł2.46M | – | zł2.46M |
| Q4 2023 | zł4.02M | – | zł4.02M |
| Q3 2023 | zł2.53M | – | zł2.53M |
| Q2 2023 | zł2.67M | – | zł2.67M |
Total Operating Expenses
Total Operating Expenses fell 49% year over year to zł0.79M in Q1 2026.
| Period | Value |
|---|---|
| Q1 2026 | zł0.79M |
| Q4 2025 | -zł10.3M |
| Q3 2025 | zł1.23M |
| Q2 2025 | zł2.04M |
| Q1 2025 | zł1.55M |
| Q4 2024 | -zł0.73M |
| Q3 2024 | zł3.07M |
| Q2 2024 | zł1.96M |
| Q1 2024 | zł2.46M |
| Q4 2023 | zł3.94M |
| Q3 2023 | zł2.53M |
| Q2 2023 | zł2.55M |
Basic EPS
Basic EPS was -zł0.03 in Q1 2026, up from -zł0.14 a year earlier.
| Period | Value |
|---|---|
| Q1 2026 | -zł0.03 |
| Q4 2025 | zł0.02 |
| Q3 2025 | zł0.00 |
| Q2 2025 | zł0.15 |
| Q1 2025 | -zł0.14 |
| Q4 2024 | -zł0.11 |
| Q3 2024 | -zł0.15 |
| Q2 2024 | -zł0.10 |
| Q1 2024 | -zł0.05 |
| Q4 2023 | -zł0.28 |
| Q3 2023 | zł0.07 |
| Q2 2023 | zł0.04 |
Free Cash Flow
Free Cash Flow was -zł1.45M in Q1 2026, up from -zł1.70M a year earlier.
| Period | Value |
|---|---|
| Q1 2026 | -zł1.45M |
| Q4 2025 | zł0.45M |
| Q3 2025 | zł1.47M |
| Q2 2025 | -zł3.48M |
| Q1 2025 | -zł1.70M |
| Q4 2024 | zł1.15M |
| Q3 2024 | zł13.2M |
| Q2 2024 | zł3.71M |
| Q1 2024 | -zł0.22M |
| Q4 2023 | -zł4.79M |
| Q3 2023 | zł1.02M |
| Q2 2023 | -zł5.47M |
Cash And Cash Equivalents
Cash And Cash Equivalents fell 50% year over year to zł4.69M in Q3 2025.
| Period | Value |
|---|---|
| Q3 2025 | zł4.69M |
| Q2 2025 | zł2.21M |
| Q1 2025 | zł7.40M |
| Q4 2024 | zł9.23M |
| Q3 2024 | zł9.30M |
| Q2 2024 | zł3.52M |
| Q1 2024 | zł2.51M |
| Q4 2023 | zł4.21M |
| Q3 2023 | zł5.98M |
| Q2 2023 | zł4.81M |
| Q1 2023 | zł3.86M |
| Q4 2022 | zł7.61M |
Change In Working Capital
Change In Working Capital was -zł0.00M in Q3 2025, down from zł15.9M a year earlier.
| Period | Value |
|---|---|
| Q3 2025 | -zł0.00M |
| Q2 2025 | zł0.00M |
| Q1 2025 | zł0.00M |
| Q4 2024 | zł0.00M |
| Q3 2024 | zł15.9M |
| Q2 2024 | zł4.35M |
| Q1 2024 | -zł0.42M |
| Q4 2023 | zł0.70M |
| Q3 2023 | -zł2.53M |
| Q2 2023 | -zł8.44M |
| Q1 2023 | -zł2.30M |
| Q4 2022 | zł23.2M |
Capital Expenditure
Capital Expenditure was -zł0.10M in Q1 2026, up from -zł0.26M a year earlier.
| Period | Value |
|---|---|
| Q1 2026 | -zł0.10M |
| Q4 2025 | -zł0.36M |
| Q3 2025 | zł0.31M |
| Q2 2025 | -zł0.05M |
| Q1 2025 | -zł0.26M |
| Q4 2024 | -zł0.21M |
| Q3 2024 | zł0.05M |
| Q2 2024 | -zł0.05M |
| Q1 2024 | -zł0.04M |
| Q4 2023 | -zł0.07M |
| Q3 2023 | -zł0.14M |
| Q2 2023 | -zł0.13M |
Energoinstal S.A. (ENI.WA) latest results in numbers
Each line compares the latest reported quarter with the same quarter a year earlier, from the figures charted above.
Total Assets fell 24% year over year to zł87.7M in Q1 2026, the eighth quarter in a row of year-over-year decline.
Total Revenue rose 29% year over year to zł10.5M in Q1 2026.
Operating Expenses fell 18% year over year to zł1.91M in Q1 2026. Selling General And Administration dragged, down 18% to zł1.91M, 100% of the total.
Total Operating Expenses fell 49% year over year to zł0.79M in Q1 2026.
Energoinstal S.A. (ENI.WA) stock price and financials
- Last close
- 1.35 PLN-2.53%
- Market cap
- $6.0M
- Exchange
- WSE
- Ticker
- ENI.WA
Quarterly financials in USD, Q2 2024 to Q1 2026, as reported.
| Metric | Q1 2026 | Q4 2025 | Q3 2025 | Q2 2025 | Q1 2025 | Q4 2024 | Q3 2024 | Q2 2024 |
|---|---|---|---|---|---|---|---|---|
| Revenue | $10.5M | $36.6M | $2.6M | -$1.9M | $8.2M | $13.3M | $15.4M | $14.0M |
| Gross profit | $777K | -$1.2M | $1.1M | $3.9M | -$860K | $570K | $351K | $733K |
| Net income | -$622K | $373K | $20.0K | $2.7M | -$2.5M | -$2.0M | -$2.7M | -$1.7M |
| EPS (basic) | -0.03 | 0.02 | 0.00 | 0.15 | -0.14 | -0.11 | -0.15 | -0.10 |
| Free cash flow | -$1.5M | $449K | $1.5M | -$3.5M | -$1.7M | $1.1M | $13.2M | $3.7M |
| Total assets | $87.7M | $87.7M | $34.6M | $84.2M | $116M | $115M | $115M | $129M |
About Energoinstal S.A.
Energoinstal S.A. manufactures, sells, and installs power boilers in Poland and internationally. The company offers energy and industrial boilers, oil and gas burners, gas/oil pressure reducing-metering stations, finned tubes, steel structures, heat pipeline elements, pressure vessels, and cladded tubes; and ventilation and dust ducts, and non-typical industrial equipment, as well as air and ducts, including flaps. It also provides assembly, repair, and maintenance services for energy and industrial steam, and water boilers; biofuels steam boilers; waste treatment boilers and auxiliary equipment; oil/gas-fired boilers; heat recovery steam generators; coal-fired boilers; boiler houses; boilers/industrial buildings supporting structures; environmental protection equipment/systems; heat pipelines; central heating, water and sewage, process heat, and chilled water networks; ventilation, air conditioning, and dedusting networks; stainless steel products/systems in food, chemical, and construction industries; and thermal insulations. In addition, the company engages in the design and supervision of steel structures, power generation equipment, and technology installations; general contract works, such as construction of industrial plants, as well as CHP construction works; and undertakes research works in the field of material engineering, welding, and materials heat treatment. Further, it provides various metal properties testing and welded joints; and training services for businesses, offices, schools, and individuals, as well as vocational training for welders. Additionally, the company offers hybrid welding of sheet pile panels, laser-welded finned tube, and robot position for laser cutting solutions. It serves the energy and construction industries, as well as electrical machines markets. The company was founded in 1949 and is based in Katowice, Poland. Energoinstal S.A. is a subsidiary of W.A.M. Sp. z o.o.
Energoinstal S.A. (ENI.WA) KPIs on Stockie
The company-specific metrics extracted from Energoinstal S.A.'s own reports, charted quarter by quarter alongside its financial statements:
- Revenue by Segment
- Revenue by Geography